Omron CJ Series Operation Manual page 131

Machine automation controller
Hide thumbs Also See for CJ Series:
Table of Contents

Advertisement

Preparing and Mounting DCN4-BR4 Flat Connector Plugs
• Component Names
Black
Lock lever
1
Cutting the Cable
Cut the cable perpendicular to the length.
To prevent short-circuits, use a sharp cutting tool such as nipper. Confirm there is no remaining
wire coming out.
2
Attaching the Cable
Confirm that the cable colors match the cable labels and insert the cable into the connector.
Confirm that the cable is inserted all the way to the back. (The cover is semi-transparent.)
3
Pressure-welding the Connector
The connector is pressure-welded using the DWT-A01 Pliers.
(1) Align the center (see arrow) of the connector cover with the center of the pressure-
welding block on the Pliers and set the cover in the Pliers.
Special tool (DWT-A01 Pliers)
CJ-series CompoNet Master Unit Operation Manual for NJ-series CPU Unit (Cat. No. W493)
Cable labels
(Flat cable: black, blue/green, white, and red)
Confirm that the cable in inserted to this point.
Connector cover
4 Installation and Wiring
4
4-23

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Nj seriesCj1w-crm21

Table of Contents