Canon imageRUNNER ADVANCE C5000 Series Technical Workbook page 225

Table of Contents

Advertisement

4) Raise the levers at a 90-degree angle further and close the process unit inner
cover. The 2 hooks (right and left) of the process unit inner cover are hooked to
the hinge shaft at the right and left sides of the main body to lock.
5) Install the front inner handle cover L [1] and the front inner handle cover R [2]
in the direction of the arrow and tighten the screw respectively.
6) Push in the drum drive unit (C) all the way to the rear and tighten the 2 screws.
16) Remove 1 screw [1] and 1 boss [2]. Pull out the hopper shield [3] to remove it while
opening the top.
17) Remove the 5 wire saddles [1], 6 harness guides [2], 4 connectors [3], and detach the
harness.
18) Remove the 2 screws [1] and the 4 grounding wires [2].
BK
7

Advertisement

Table of Contents
loading

Table of Contents