Gas Shortage Program - Siemens LMV27.100x2 Basic Documentation

Basic unit with integrated air-fuel ratio control for forced draft burners
Table of Contents

Advertisement

58/219
Building Technologies
7.5.3.6.

Gas shortage program

Valve proving via pressure switch-min-gas (parameter 236 = 2)
As gas pressure switch-min-gas is located between the valves, the gas shortage test
cannot be made in phase 22. Instead, when performing valve proving on startup, the
gas shortage test is performed at the end of the filling time (end of phase 82).
With no valve proving on startup, the gas shortage test is made directly before first
safety time is started (end of phase 39).
No.
Parameter
Gas: Input pressure switch-min
2 = valve proving (between fuel valve V1 and fuel valve V2) via pressure
236
switch-min
Standard valve proving (parameter 236 = 1)
If the gas pressure is too low, startup will be aborted in phase 22.
No.
Parameter
Gas: Input pressure switch-min
236
1 = pressure switch-min before fuel valve V1 (default setting)
246
Gas: Gas shortage waiting time
If gas shortage occurs with the last of the parameterized number of start attempts, the
system initiates lockout.
No.
Parameter
Repetition limit pressure switch-min-gas
1 = no repetition
2...15 = 1...14 number of repetitions
223
16 = constant repetition
Recharging time:
After the Operation phase
In that case, the LMV27 with gas shortage program makes a selectable number of start
attempts until lockout occurs. The waiting time from one start attempt to the next is
doubled each time, starting from an adjustable waiting time.
Basic Documentation LMV27...
7 Basic unit LMV27
CC1P7541en
17.12.2018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents