Siemens LMV27.100x2 Basic Documentation page 211

Basic unit with integrated air-fuel ratio control for forced draft burners
Table of Contents

Advertisement

Building Technologies
Software version V01.90
Scaling of analog input changed (no burner OFF functionality)
Optimization: Variable step width between ignition and low-fire (40% difference in
speed, independent of ramp time; traveling time varies between 4 and 16 seconds
with a 5- to 20-second ramp)
Optimization: Checking the standardized speed between microcomputer 1 and
microcomputer 2 (wrong standardized speeds after restore)
Objective: Avoiding wrong standardized speeds after restore to new hardware
resulting from resonator tolerances of the 2 microcomputers
Optimization: Parameter access when firing on oil
Optimization: Assessment of Pmin in phase 62
Software version V2.00
Correction to fuel train Gp1: First safety time was up to 0.4 seconds too long
Correction to fuel train Gp1: Evaluation of pressure switches in phases 40 to 50
(Pmin / Pmax were not valued in phase 44, Pmin / Pmax were evaluated in phase
50 although the main valve was switched on)
First error reception for gas shortage with first setting (gas shortage error was
exceeded with first setting of OFF UPr – both errors occur in the same cycle)
Timeout (parameter 127) or communication breakdown with the AZL2 leads to
lockout during the time the curves are set (error code: 167, diagnostics: 8)
 with cold setting, no startup on completion of the password time
Communication breakdown with the ACS410 (30 seconds) leads to lockout during
the time the curves are set (error code: 167, diagnostics 9)
Software version V02.90
Optimization: Indication of errors on the parameter and info / service menu
Optimization: Rectification of eBus error telegrams, correction of manufacturer's
code for safety temperature limiter, extension of service data query PB:03h SB:10h
in order to read out / query the meter readings for the second fuel; the current fuel is
output in query PB:05h SB:09h
Optimization: Curve setting invalid (OFF UPr) upon change to cold settings
Optimization: Setting of minimum / maximum output via the parameterized
output
Optimization: Shorter startup time with valve proving (prepurge or postpurge time
simultaneously with valve proving)
New function: Loss-of-flame test (TÜV test), forced shutdown of fuel valves
Extension: Oil pressure switch-min active from phase 38 or safety time (phase 40)
Extension: Setting of dead band zone for load controller contacts, analog input and
BACS output
Extension: POC for firing on oil (alternative to pressure switch-max)
New function: Valve proving via pressure switch-min
New function: Abortion of postpurging (see postpurge time, extraneous light test in
phase 78)
New function: Evaluation of load controller contacts for multistage operation (normal
/ interchanged)
New fuel trains LoGp, Lo-2V, LoGp-2V
New operating modes (e.g. without actuator)
New function: Backup / restore via AZL2 (only with new software version AZL2)
Basic Documentation LMV27...
29 Revision history LMV27
211/219
CC1P7541en
17.12.2018