Panasonic CZ-256ESMC3 Operating Instructions Manual page 209

Intelligent controller
Hide thumbs Also See for CZ-256ESMC3:
Table of Contents

Advertisement

The "Test run" screen
A:
Select the line numbers of the outdoor
units you want to run a test operation
for. The "Line No." dialogue is displayed
when you touch this.
B:
Set the link system of the outdoor units
you want to run a test operation for. The
"Link" dialogue is displayed when you
touch this.
C:
Outdoor units are displayed in a list.
Item
Explanation
Slct
Select the outdoor units you want
to run a test operation for.
O/D unit
The outdoor units in the linked
system selected at B are
displayed.
Stus
The operation mode while testing
operation is displayed.
D:
The indoor units that are connected to
outdoor units with a check mark in C are
displayed.
E:
Test operation is performed. The operation dialogue is displayed when you touch this.
A
B
C
209
Running a test operation
D
E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents