Connecting
3.1
Procedure for installing the frequency inverter
Prerequisites for installing the inverter
Check that the following prerequisites are fulfilled before you install the inverter:
● Are the components, tools and small parts required for installation available?
● Are the ambient conditions permissible? See Technical data (Page 261).
● Have the cables and wires been routed in accordance with the applicable regulations?
● Are the minimum distances from other equipment complied with? (Cooling sufficient?)
Installation sequence
You will find details on how to install the inverter in the Internet: Hardware Installation
Manual (http://support.automation.siemens.com/WW/view/en/30563173/133300).
You can start to commission the inverter once installation has been completed.
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA
See EMC-compliant connection (Page 46).
See Dimensions, hole drilling templates, minimum clearances, tightening torques
(Page 34).
①
Installing reactors and filters (Page 32)
②
Installing the Power Module (Page 33)
③
Installing Control Unit (Page 50)
3
31