Commissioning
4.1 Typical commissioning scenarios
Commissioning guidelines
①
②
③
④
⑤
⑥
Figure 4-1
56
Preparing commissioning (Page 57)
Commissioning with factory settings (Page 60)
Commissioning with the BOP-2 (Page 68)
Commissioning with STARTER (Page 73)
Connection to a fieldbus (Page 103)
Configuring the terminal block (Page 93)
Functions (Page 155)
Commissioning procedure
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA