Verify Shipment Contents; Lifting And Moving The Bti7814 Chassis - Juniper BTI7800 Series Hardware Overview And Installation Manual

Table of Contents

Advertisement

BTI7800 Series Hardware Overview and Installation Guide

Verify Shipment Contents

Lifting and Moving the BTI7814 Chassis

Component
Lift handles
Support frame
Brackets
Two packets of nuts and bolts
70
With the chassis still on the pallet, remove the plastic strapping from the box and lift
the box up, over and away from the chassis. Place the box out of the way, so that it
is not obstructing the area around the chassis, or obstructing the path to the chassis
rack. Before moving the chassis, refer to
page
70.
Perform a visual inspection of all equipment to verify that it is not damaged from the
5.
transport.
You have successfully completed this procedure.
Refer to your bill of sale to verify which and how many components should be included
with your shipment. For details on the contents of the different chassis kits, see
Chassis Kits" on page
32,
"BTI7802 Chassis Kits" on page
on page
38.
This section describes how to use the optional 14-Slot Chassis Shelf Installation Support
Bracket Kit (BT8A78SSB1) to lift and move the BTI7814 chassis to the rack for installation.
This Shelf Installation Support Bracket Kit can be used for EIA, Weco and ETSI frame
types—19 inches, 21 inches, and 23 inches (482.6 mm, 533.4 mm, 584.2 mm).
Description
Used to assist in lifting the chassis. Recommended to be used only to position the
chassis in the lower rack position.
Used to support the chassis during installation.
Used to attach the support frame to the rack.
Used to secure the brackets to the support frame.
"Lifting and Moving the BTI7814 Chassis" on
35, or
"BTI7801 Chassis Kits"
Copyright © 2019, Juniper Networks, Inc.
"BTI7814

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bti7814Bti7802Bti7801Bt8a78ch14Bt8a78ch2-i02Bt8a78ch1

Table of Contents