Table 17: Site Preparation Checklist (continued)
Item or Task
Plan rack location, including
required space clearances.
Secure the rack to the floor
and building structure.
Cables
Acquire cables and
connectors:
Determine the number of
cables needed based on
your planned configuration.
Review the maximum
distance allowed for each
cable. Choose the length of
cable based on the
distance between the
hardware components
being connected.
Plan the cable routing and
management.
Related
Documentation

PTX1000 Site Guidelines and Requirements

PTX1000 Environmental Requirements and Specifications

46
For More Information
"PTX1000 Clearance Requirements for Airflow and
Hardware Maintenance" on page 49
Determining Transceiver Support for the PTX1000
on page 52
Cable and Connector Specifications for MX Series
and PTX Series Devices on page 53
PTX1000 Installation Safety Guidelines on page 66
Chassis and Component Lifting Guidelines on page 118
PTX1000 Environmental Requirements and Specifications on page 46
General Site Guidelines on page 48
PTX1000 Chassis Grounding Cable and Lug Specifications on page 48
PTX1000 Clearance Requirements for Airflow and Hardware Maintenance on page 49
PTX1000 Physical Specifications on page 50
Site Electrical Wiring Guidelines on page 50
PTX1000 Rack Requirements on page 51
The PTX1000 must be installed in a rack. It must be housed in a dry, clean, well-ventilated,
and temperature-controlled environment.