Sunny Island
"PARGEN" (3+6)
Name
Description
627_PldS GenOn
628_PldS GenOff
629_TavgLdLx
630_TavgLdSum
631_PldLzMin
632_PldLzMax
633_PConsMin
634_PConsMax
635_PChargeMax
636_PDump1
637_PDump2
638_PBHKWMin
639_PBHKWMax
640_BHKW_Ton
641_BHKW_Toff
BWRI33-12:EE
- 100 ... 100 %
Switch-on threshold in % of the nominal power based on the
cumulative power within the three-phase sys tem for the
power-related generator start or the power-related relays
(only K5 or K6).
If the relays shall be switched in relation to the power, the parameters
"705_Man K5" and/or "706_Man K6" must be set to "LOAD"
- 100 ... 100 %
Switch-off threshold in % of the nominal power based on the
cumulative power within the three-phase sys tem for the
power-related generator start or the power-related relays
(only K5 or K6).
If the relays shall be switched in relation to the power, the parameters
"705_Man K5" and/or "706_Man K6" must be set to "LOAD"
5 ... 60 s
Averaging time for the power calculation per phase (see also
"625_PldL GenOn" and "626_PldL GenOff")
1 ... 20 min
Averaging time for the calculation of the cumulative power
within the three-phase system (see also "627_PldS GenOn"
and "628_PldS GenOff")
0 ... 100 %
Lower limit for the charging state, when the Ecopower CHP
will always be started
0 ... 100 %
Upper limit for the charging state, when the Ecopower CHP
will never be started
0 ... 2000 W
Power limit for the load power (cumulative power averaged
over all three phases within the time period of the parameter
"630_TavgLdSum"), that has to be exceeded, in order to
start the Ecopower CHP even in the case of charging states
between "631_PldLzMin" and "632_PldLzMax".
0 ... 10.000 W
Upper limit for the load power (cumulative power averaged
over all three phases within the time period of the parame-
ter), when the Ecopower CHP will already be started in the
case of a charging state of
0 ... 16.000 W
Setpoint for the charging power, that the Sunny Island ob-
tains from the Ecopower CHP.
0 ... 8.000 W
Power of Dumpload 1, that has to be connected to the relay
K1 of the Sunny Island during the operation with the eco-
power CHP. ("701_Man K1" = Auto)
0 ... 8.000 W
Power of Dumpload 2, that has to be connected to the relay
K6 of the Sunny Island during the operation with the Eco-
power CHP. ("706_Man K6" = Auto)
0 ... 4.000 W
Minimum power of the Ecopower CHP
0 ... 10.000 W
Maximum power of the Ecopower CHP
0 ... 10.000 s
Minimum run-time of the Ecopower CHP
0 ... 10.000 s
Minimum pause time of the Ecopower CHP