SMA Sunny Island SI3300 Installation & Operating Instructions Manual page 86

Bidirectional battery inverter for stand-alone applications
Table of Contents

Advertisement

Sunny Island
"PARGEN" (3+6)
Name
Description
604_GenSet Ctrl
605_GenStRetr
606_CurTrfRatio
607_Igen max
610_tGen glow
611_tGen crank
612_tGen warm
613_tGen minrun
614_tGen cool
615_tGen stop
616_tGen lock
617_tGen fail
618_tGen faillock
625_PldL GenOn
626_PldL GenOff
BWRI33-12:EE
The Sunny Island reduces its current input in charge operation (RUN_I) ...
0: OFF:
... no reduction
1: F_MAINS:
... reduction as a function of generator frequency
2: I_DIESEL:
... as a function of generator current (converter required, see
chapter 3.4.5)
3: BOTH:
... as a function of generator frequency and current (con-
verter required, see chapter 3.4.5)
0 ... 30:
Max. number of attempts to start the generator, before the
state "Fail Locked" is reached (see also parameter 618). Af-
ter the minimum run-time of the generator has expired, the
counter will be reset.
0 ... 1000 A per 5 A:
ment of generator current
0 ... 500 A:
Max. generator current (per phase)
1 ... 180 s:
Length of time the relay is controlled to glow up the
generator
1 ... 60 s:
Length of time the relay is controlled to crank the generator
1 ... 900 s:
Warm-up time of generator
1 ... 180 min:
Minimum run time of generator
1 ... 900 s:
Cooling time of generator
1 ... 180 s:
Length of time the relay is controlled to stop the generator
1 ... 180 min:
Period of time the generator – after having been stopped -
cannot be restarted via the Sunny Island (can be shortened
by acknowledgement in the "GENSET" (2-2) menu)
1 ... 180 min:
Period of time the generator cannot be restarted via the
Sunny Island after a generator failure (can be shortened by
acknowledgement in the "GENSET" (2-2) menu)
1 ... 168 h:
Period of time the generator cannot be restarted via the
Sunny Island after a certain number of failures as defined in
"605_GenStRetr" has occurred during start-up (can be
shortened by acknowledgement in the "GENSET" (2-2)
menu)
-100 ... 100 %
Switch-on threshold in % of the nominal power at one phase
for the power-related generator start or the power-related re-
lays (only K5 or K6).
If the relays shall be switched in relation to the power, the parameters
"705_Man K5" and/or "706_Man K6" must be set to "LOAD"
-100 ... 100 %
Switch-off threshold in % of the nominal power at one phase
for the power-related generator start or the power-related re-
lays (only K5 or K6)
If the relays shall be switched in relation to the power, the parameters
"705_Man K5" and/or "706_Man K6" must be set to "LOAD"
Installation & Operating Instructions
Current transformer ratio (in A per 5 A) for measure-
- 86 -
SMA Regelsysteme GmbH

Advertisement

Table of Contents
loading