„PARALL" (3+9)
Parameter
Unit Min. Max.
628_PldS GenOff
%
629_TavgLdLx
Sec
630_TavgLdSum
Min
631_PldLzMin
%
632_PldLzMax
%
633_PConsMin
W
634_PConsMax
W
635_PChargeMax
W
636_PDump1
W
637_PDump2
W
638_PBHKWMin
W
639_PBHKWMax
W
640_BHKW_Ton
BWRI33-12:EE
Default
-100
100
0
5
60
10
1
20
1
0
100
60
0
100
85
0
2000
1000
0
10000
3000
0
16000
3000
0
8000
500
0
8000
2000
0
4000
2200
0
10000
4700
s
0
10000
300
Installation & Operating Instructions
Description
Switch-off threshold in % of the nominal power
based on the cumulative power within the three-
phase system for the power-related generator start
or the power-related relays (only K5 or K6). If the
relays shall be switched in relation to the power,
the parameters "705_Man K5" and/or "706_Man
K6" must bei set to "LOAD"
Averaging time for the power calculation per phase
(see also "625_PldL GenOn" and "626_PldL Gen-
Off")
Averaging time for the calculation of the cumulative
power within the three-phase system (see also
"627_PldS GenOn" and "628_PldS GenOff")
Lower limit for the charging state, when the Eco-
power CHP will always be started
Upper limit for the charging state, when the Eco-
power CHP will never be started
Lower limit for the load power (cumulative power
averaged over all three phases within the time pe-
riod of the parameter "630_TavgLdSum"), that has
to be exceeded, in order to start the Ecopower CHP
even in the case of charging states between
"631_PldLzMin" and "632_PldLzMax".
Upper limit for the load power (cumulative power
averaged over all three phases within the time pe-
riod of the parameter), when the Ecopower CHP
will already be startet in the case of a charging
state of "632_PldLzMax".
Setpoint for the charging power, that the Sunny Is-
land obtains from the Ecopower CHP.
Power of Dumpload 1, that has to be connected to
the relay K1 of the Sunny Island during the opera-
tion with the Ecopower CHP. ("701_Man K1" = Au-
to)
Power of Dumpload 2, that has to be connected to
the relay K6 of the Sunny Island during the opera-
tion with the Ecopower CHP. ("706_Man K6" = Au-
to)
Minimum power of the Ecopower CHP
Maximum power of the Ecopower CHP
Minimum run-time of the Ecopower CHP
- 139 -