SMA Sunny Island SI3300 Installation & Operating Instructions Manual page 72

Bidirectional battery inverter for stand-alone applications
Table of Contents

Advertisement

Sunny Island
Name
Description
State
Operating state of generator
Fail
Fail state of generator
601_GenSet Oper
0: Auto:
1: Man. Start:
2: Man. Stop:
3: Man. Ackn.:
* However, parameterized times are kept to.
"PARGEN" (3+6)
Name
Description
602_GenSet Type
None:
Grid forming:
Mains:
BHKW-Mains Sunny Island is operated together with the Ecopower CHP and on
BHKW-Island
Mains form
fast Grid form
fast Mains
fast Mains form
603_GenSet Interf
0: None:
1: Type 1:
2: Type 2:
3: Type 3:
4: EcoPower
(see also chapter 16 "Starting phase sequence of different generator types")
604_GenSet Ctrl
The Sunny Island reduces its absorption of current in charging operation
(RUN_I)...
OFF:
F_MAINS:
I_DIESEL:
BWRI33-12:EE
Installation & Operating Instructions
The generator is automatically started and stopped by the
Sunny Island.
The generator is started immediately*.
The generator is stopped immediately*.
Waiting times due to failures or parameters are finished.
No generator present in island grid
Generator forms the grid
Sunny Island is operated on public utility grid
the public utility grid
Sunny Island is operated solely together with the Ecopower
CHP
Sunny Island is operated together with a grid-forming genera-
tor and on the public utility grid
Generator is grid-forming and it is switched between the gen-
erator and the Sunny Island without interruption (special instal-
lation measures are necessary for this)
The Sunny Island is operated on the public utility grid and it is
possible to switch from the Sunny Island as grid-former to the
public utility grid without interruption. (special installation
measures are necessary for this)
The Sunny Island is operated together with a grid-forming
generator and on the public utility grid. Switching takes place
without interruption (special installation measure are neces-
sary for this)
No generator start by Sunny Island
Autostart, relays K1 + K2
3 contacts Run / Start, relays K1, K2, K5
3 contacts Start / Stop, relays K1, K2, K5
Ecopower CHP
... not at all
... as a function of generator frequency
... as a function of generator current (converter required, see
- 72 -
SMA Regelsysteme GmbH

Advertisement

Table of Contents
loading

Table of Contents