List Of Tables - SMA Sunny Island SI3300 Installation & Operating Instructions Manual

Bidirectional battery inverter for stand-alone applications
Table of Contents

Advertisement

Sunny Island
Installation and Operating Instructions

24 List of Tables

Table 3.1: Description of terminal strip ......................................................................24
Table 3.2: Assignment of COM1 (SYNC BUS) interface ...........................................44
Table 3.3: Assignment of COM2 interface (RS485 / RS232) ....................................45
Table 3.4: Assignment of Sunny Island interface (COM3) ........................................50
Table 4.1: Meaning of symbols .................................................................................53
Table 4.2: Function of keys .......................................................................................53
Table 4.3: Key combination to set up display............................................................54
Table 4.4: Key combination for fast return to status display......................................54
Table 4.5: Contents of the four menu branches ........................................................57
Table 6.1: Parameters to be entered for configuration via "New System" .................64
Table 6.2: Parameters to be entered for configuration via "New Battery" .................67
Table 7.1: Settings for the menu "GENSET" (2-2).....................................................73
Table 7.2: Settings in the menu „BHKW" (2+5) .........................................................74
Table 8.1: Settings in menu "PARSYS" (3+3) ...........................................................79
Table 8.2: Settings in menu "PARGRD" (3+4)...........................................................81
Table 8.3: Settings in menu "PARBAT" (3+5) ...........................................................84
- 178 -
BWRI33-12:EE
SMA Regelsysteme GmbH

Advertisement

Table of Contents
loading

Table of Contents