Fujitsu ETERNUS DX S5 Series Configuration Manual page 33

Hybrid storage systems
Hide thumbs Also See for ETERNUS DX S5 Series:
Table of Contents

Advertisement

3. Rack Installation
Power Distribution Unit Installation
3
Install the power distribution unit in the rack.
Fasten it to the prepared holes in the pillars with eight M5 screws.
M5 screw
4
Attach the blank panel to the rack front.
The blank panel should be attached at the same height as the power distribution unit.
Power distribution unit
(Rack pillar: rear)
(Rack pillar: rear)
M5 screw
Blank panel
(Rack pillar: front)
33
Configuration Guide (Basic)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents