Regency City CB72EPV-LP Owners & Installation Manual page 93

Hide thumbs Also See for City CB72EPV-LP:
Table of Contents

Advertisement

CITY SERIES 72
19. Install Log 12--line up the pin locator on Log 12 with the pin on Log 3
and rest the other end of Log 12 on the rest on Log 8 as shown below.
8
in Log 4. Rest the opposite end of Log 13 on the back edge of the
burner as shown.
13
2
13
15
919-901
12
Log 12
Log 13
9
10
5
4
21. Install Log 14--place one end of Log 14 on the rest on Log 8 and the
opposite end on the back edge of the burner as shown below.
8
the burner as shown below.
1
11
6
7
Final Install
4
installation
14
Log 14
Logs 15 + 16
3
12
14
8
City Series CB72EPV |
16
93
08.30.18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

City cb72epv-ngCity cb72e power vent series

Table of Contents