Optional Framing Kit Cb72Epv - Regency City CB72EPV-LP Owners & Installation Manual

Hide thumbs Also See for City CB72EPV-LP:
Table of Contents

Advertisement

installation

Optional Framing Kit CB72EPV

Optional Framing Kit
Tools/hardware required:
- Level
- Stud fi nder
- Cordless screwdriver
- Phillips bit
- 5/16 inch hex head bit
- 2'' to 3'' wood screws (minimum 16)
- Flashlight
Note: Extra screws are provided to assemble this kit.
*See last page of these instructions for assembled overview.
Before starting the installation, ensure the wall framing contains 2 additional
studs spaced 81-1/4" (2064mm) apart from center to center. The framing will
need to be secured to these studs as well as secured to the original studs
of the wall framing.
Additional wall studs required
81-1/4" center to center
Framing Kit with unit - Overall dimensions
| City Series CB72EPV
40
919-951a
CB72EPV framing kit parts layout*
1. Assemble the back frame as shown below by assembling 2x Part B with 2x
Part H with 8 screws installed from back of frame.
2. Install the frame assembled in Step 1, onto the back of the unit as shown
with 2 screws on each side.
Install back frame on unit
3. Place unit against wall in desired location. Level the unit by adjusting 4
leveling bolts on unit.
4. Install venting before proceeding further with framing kit construction. Refer
to manual for venting instructions.
1
CITY SERIES
Assemble back frame
(view from back)
01.24.19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

City cb72epv-ngCity cb72e power vent series

Table of Contents