Power vent terminal installation
WARNING
ELECTRICAL CONNECTIONS SHOULD ONLY BE
CARRIED OUT BY A QUALIFIED AND LICENSED
ELECTRICIAN
1. Frame an opening to the outside of the building at 13-1/2" W x
13-1/2" H to accommodate the Power Vent.
13-1/2"
Determine
the correct
height
2. Run the venting and BX cable from the unit to the framed opening.
3. Install the strain relief (supplied) to the back of the Power vent mount box.
4. Strip the sheath from the BX cable to expose approximately 8" of
exposed wires.
5. Feed the BX cable through the strain relief installed in Step 3.
919-851a
13-1/2"
Strain Relief
6. Determine the building finishing material thickness.
7. Depending on the building material thickness, install the frame onto
the Power Vent mount using 4 screws. Mounting holes start at 2"
from the front of the Power Vent unit cover and can be adjusted back
in 3/4" increments.
NOTE: Exterior finishes such as thin vinyl siding may warp if closer
than 2" from them vent. For interior installations on vinyl siding, a 2"
frame/buffer zone must be created between the finishing and the vent.
8. Install Power Vent unit into framed opening using 4 screws as shown
below.
9. Seal the edges of the Power Vent unit to the framing (there are two
seams).
Silicone edge of inner trim
against siding of structure,
wipe any excess silicone off
trim.
3
CV72EPV / CB72EPV
installation
Determine finishing
material thickness
Determine protrusion
of faceplate
Set frame depth
(starting @ 2" of
faceplate protrusion)
Adjustable Power Vent Frame
Seal behind flange with silicone--
screw against Plywood siding. Wipe
any excess silicone off outer flange
after flange is screwed down.
01.30.19
City Series CB72EPV |
67

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

City cb72epv-ngCity cb72e power vent series

Table of Contents