EFI E-43A Installation And Service Manual page 83

Color controller
Table of Contents

Advertisement

R
EPLACING PARTS
T
O REPLACE THE SWITCH BANK ASSEMBLY
1 If it is not already attached, attach the DVD drive to the switch bank assembly
(see
page
85).
2 Install the switch bank assembly in the component sled (see
N
:
If you are replacing the switch bank assembly with a new one, discard the cable
OTE
extensions that may be provided with the new switch bank assembly.
• Starting with the cables, insert the switch bank assembly through the opening in the front
of the component sled. Be sure to fold the EMI gasket under and through the opening
when inserting the assembly.
• Replace the three screws that secure the switch bank assembly to the component sled.
3 Install the component sled in the chassis (see
• Route the cables of the switch bank assembly in through the chassis so that the cables are
within reach of their connectors on the motherboard.
• Slide the sled into the front of the chassis until the guide latches click into place.
Be careful not to damage the EMI gasket around the slot in the chassis when installing
N
:
OTE
the component sled.
4 Connect the following cables (see
motherboard):
• Power and data combination cable
• DVD data cable
• Power button cable
• Reset button cable
• Speaker cable
• Front panel USB port cables
5 Install the ferrite around the two front USB port cables near the motherboard.
Use the ferrite that you removed earlier. Place the ferrite around both cables in between the
two preinstalled tie-wraps, and snap the edges of the ferrite closed.
6 Secure the cables with the cable clamp(s) inside the chassis.
7 Reassemble the E-43A and verify its functionality (see
Figure
32).
Figure on page 57
for the location of connectors on the
page
Figure
33).
86).
83

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents