Perkins 900 Series Workshop Manual page 208

3 cylinder, naturally aspirated, and turbocharged diesel engines for agricultural and industrial use
Table of Contents

Advertisement

12
900 Series
To test
Operation 12-2
Caution: If the thermostat does not operate correctly, it must be renewed. Do not try to adjust the settings.
1 Hang the thermostat unit in a suitable container filled with coolant.
2 Heat the coolant gradually. Use a thermometer to check the temperature at which the valve starts to open
and the temperature at which it is fully open. The correct temperature is given in the relevant Data and
dimensions for the "Thermostat" on page 26.
198
Workshop Manual, TPD 1345E, issue 3
This document has been printed from SPI². Not for Resale

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CpCr

Table of Contents