7
900 Series
11 Fit new piston rings.
Cautions:
l After a new cylinder liner has been fitted, these recommendations are advised for the first 240 km
(150 miles) or 5 hours of operation:
l Do not operate the engine at full load.
l Do not operate the engine at high speed.
l Do not allow the engine to run at low idle speed for long periods.
12 Clean the new cylinder block thoroughly. Ensure that all the oil passages are clean and free from debris
and that all excess loctite 640 is removed from the bottom of the liner. Assemble the cylinder block as in
Operation 7-2.
118
Workshop Manual, TPD 1345E, issue 3
This document has been printed from SPI². Not for Resale