SETUP AND PROCEDURES BEFORE OPERATION
1 The mode switching (normal mode to offset/gain setting mode to normal mode) method
2 Turning ON the channel change request (YB) starts power supply from the
3 Avoid the following operations during the steps indicated with
4 - 17
is given below.
• Dedicated instruction (G(P).OFFGAN) ....... Refer to Section 4.6.2 (2) (a)
• Setting made to mode switching setting (buffer memory addresses 158, 159:
Un\G158, Un\G159) and turning the operation condition setting request (Y9) from OFF
to ON ........................................................... Refer to Section 4.6.2 (2) (b)
• Intelligent function module switch setting ... Refer to Section 4.5, Section 4.6.2 (2) (c)
(After intelligent function module switch setting, reset the programmable controller
CPU or switch power OFF, then ON.)
corresponding channel to the 2-wire transmitter. After fully checking the wiring, settings,
etc., turn ON the channel change request (YB).
an error in the data inside the E
normally.
• Powering OFF the programmable controller CPU
• Resetting the programmable controller CPU
2
PROM, resulting in the Q62AD-DGH failing to operate
MELSEC-Q
3. Doing so may cause