LANGUAGE
ENGLISH
1) HEURE/DATE
>2) LANGUE
3) EN MARCHE
4) MODES FLUSH
Set Up Power On Mode
RUNNING
JAN-01-12
12:01P
1) GO TO RUNNING
2) GO TO OFFLINE
3) INFORMATION
>4) SETUP
1) TIME/DATE
2) LANGUAGE
>3) POWERON MODE
4) FLUSH MODES
POWERON MODE
OFFLINE
RUNNING
JAN-01-12
12:01P
Flush Modes
The GBE RO controller can be programmed to operate up to six different flush modes. Multiple flush modes can be speci-
fied and operating at any one time. If any one or more flush modes are calling for flushing to happen at a certain time, the
flush will take place. Some flush modes require additional plumbing and components such as solenoid valves.
Startup Flush
In this mode the fast flush solenoid (SV-2) opens for a specified number of minutes each time that the pump turns on.
Standby Flush
In this mode any time that the system state is in STANDBY, the inlet AND fast flush solenoids open for a specified number of
minutes every specified number of hours. This is a line-pressure-level flush (ie the pump does NOT turn on during this flush).
Culligan® Series G1 Reverse Osmosis
34
5.
Press
or
and then
language.
6.
The screen displays the setup menu in the selected language of the RO controller.
1.
From the default home screen, press
2.
Press
to scroll to 4) SETUP.
3.
Press
to select the SETUP menu.
4.
Set Time/Date is the first menu item, so press
MODE.
5.
Press
or
and then
RUNNING
OFFLINE
6.
Press
to return to the home screen.
to change the display to your preferred
. The screen displays the main menu.
to select Power On Mode options.
The RO system will start whenever power is supplied.
The RO system will go into standby when power is sup-
plied to the unit.
to select 3)POWERON
Cat. No. 01021713
34