Configure Cp Port 2; Configure Cp Port 3 (If Required); Configure Cp Port 4 (If Required) - Ericsson EDA 2530 Commissioning Instructions

Commissioning procedure for cable and wireless access
Table of Contents

Advertisement

e.
f.
7.2.2

Configure CP Port 2

a.
b.
7.2.3

Configure CP Port 3 (If required)

a.
b.
7.2.4

Configure CP Port 4 (If required)

a.
b.
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
In the "MAU AUTO NEGOTIATION" area of the window change the "Admin
Status" field from enabled to disabled. Now select the "Apply" button then
select "Refresh".
Select another folder, & check that Port 1 interface changes colour from
Yellow to Green.
Note: The port status will only turn to Green if there is a signal on the fibre
and it is connected to the port.
Note: CP SFP Port 2 interface is used to subtend Child#1 (EDA 2510)
Select Port 2 and follow steps d. to f. of Section 7.2.1 above to configure CP
Port 2. Do NOT select the "Local In-Band Mng" option, this is required for CP
Port 1 only.
Select "Close" to return to the main LCT screen.
Note: CP SFP Port 3 interface is used to subtend Child#2 (EDA 2530)
Select Port 3 and follow steps d. to f. of Section 7.2.1 above to configure CP
Port 3. Do NOT select the "Local In-Band Mng" option, this is required for CP
Port 1 only.
Select "Close" to return to the main LCT screen.
Note: CP SFP Port 4 interface is used to subtend Child#3 (EDA 2530)
Select Port 4 and follow steps d. to f. of Section 7.2.1 above to configure CP
Port 4. Do NOT select the "Local In-Band Mng" option, this is required for CP
Port 1 only.
Select "Close" to return to the main LCT screen.
EDA 2530 Commissioning Procedure for Cable and Wireless Access
© Ericsson AB 2010
Commercial in confidence
73 (200)