Certification Of Tests - Ericsson EDA 2530 Commissioning Instructions

Commissioning procedure for cable and wireless access
Table of Contents

Advertisement

11.2

Certification Of Tests

Both the Ericsson representative and the Customer's representatives must sign in
the spaces provided to certify that these results are a true and accurate record of
the tests performed, in line with the Commissioning Specification (1/153 22-FGC
101 0239/2 Uen). The Customer's representative will complete their Checklist after
Migration is complete.
ERICSSON REPRESENTATIVE
COMPANY NAME
If the Customer's representative is not present (or at the Remote NOC) enter as N/A
(Not Available)
CUSTOMER REPRESENTATIVE
COMPANY NAME
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
EDA 2530 Commissioning Procedure for Cable and Wireless Access
NAME :____________________________
COMPANY NAME :____________________________
SIGNATURE :____________________________
DATE :____________________________
COMPANY NAME :____________________________
SIGNATURE :____________________________
DATE :____________________________
End of section
© Ericsson AB 2010
Commercial in confidence
184 (200)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents