3

Resources

The following equipment is required to carry out the tests described in this
document.
3.1

Documentation

The following documentation is required to commission the EDA 2530.
No.
Description
1
This
document
Procedure for Cable and Wireless Access.
2
The EDA 2530 Software and Firmware Release
Note for the release of the EDA 2530 being
commissioned.
3
Customer specific Configuration information i.e.
Floor Plan, EDA 2530 Rack Layout, EDA 2530
Subrack equipment allocations, Cable Running Out
Lists.
3.2

Tools

No.
Description
1
Anti Static Wrist Strap and connection cable.
2
Anti Static bags for Slide in Units or Anti Static
containers.
3
Screwdrivers – Flat Blade and Crosshead.
4
Side Cutters
5
Krone IDC Connection tool see picture
6
Continuity Tester (Buzzer) for checking new cables.
7
T-Bar Unit Extraction Tool
3.3

Test Equipment

Record details of the test equipment used on the Record of Test Equipment Form.
Approved equivalents may be used if the items specified are not available.
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
EDA
2530
Commissioning
EDA 2530 Commissioning Procedure for Cable and Wireless Access
Code
2/153
22-FGC
0239 Uen
Code
CWA013
151-2765/01
© Ericsson AB 2010
Commercial in confidence
Qty
101
1
1
1
Qty
1
As
required
2
1
2
1
1
33 (200)