Step 4: Configure Itam For Double Play - Ericsson EDA 2530 Commissioning Instructions

Commissioning procedure for cable and wireless access
Table of Contents

Advertisement

7.17.5

Step 4: Configure ITAM For Double Play

a.
b.
c.
d.
e.
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
From the LCT main screen select the path;-
Configuration > Connection Modules
On the "Connection Modules configuration" screen wait for the information
to be read into the table.
st
Highlight the 1
Connection Module for the combined ADSL/POTS slot to
be configured.
Click on the View/Modify Selected Connection Module button.
Set the Connection Module Type to cm-adslpotsx64-TAM-PPB for
Connection Module type 02HAT00282AAQ, if not already set.
EDA 2530 Commissioning Procedure for Cable and Wireless Access
© Ericsson AB 2010
Commercial in confidence
124 (200)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents