Mitsubishi Electric GT1695M-XTBD User Manual page 433

Got1000 gt16 series graphic operation terminal
Hide thumbs Also See for GT1695M-XTBD:
Table of Contents

Advertisement

3
System configuration check sheet
Fill in the brackets with the unit/module name.
(1) System configuration of the GOT
(a) GOT main unit
(b) Option function board
(c) Communication interface
(d) Option unit
(e) Cable between the PLC and GOT
(f) Cable length
(g) If any other unit etc. is used, please describe it.
(2) System configuration of the PLC
(a) Power supply module
(b) CPU module
(c) Serial communication module/
computer link module
(d) Network module
(e) Interrupt module
(f) Positioning module
(g) Number of extension stages
(h) If any other module etc. is used, please describe it.
[
Used
[
Not used
Communication
[
unit
GOT built-in interface
Used
[
Not used
[
[
[
[
Used
[
Not used
Used
[
Not used
Used
[
Not used
Used
[
Not used
[
(Continued to next page)
16.1 GOT Restoration Sheet
9
]
]
10
]
]
11
]
m]
12
]
]
]
13
]
]
]
14
stages]
15
16
16
- 12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt1685m-stbaGt1685m-stbdGt1695m-xtba

Table of Contents