Mitsubishi Electric GT1695M-XTBD User Manual page 411

Got1000 gt16 series graphic operation terminal
Hide thumbs Also See for GT1695M-XTBD:
Table of Contents

Advertisement

4
Turning the CF card access switch off executes Core OS installation.
5
When the installation is completed, the dialog as shown below is displayed.
(The POWER LED of the GOT blinks (green/orange) at the installation completion.)
Confirm that the message is displayed and power the GOT off.
6
Remove the CF card after powering the GOT off.
7
Powering the GOT on again displays the screen as shown below.
(The GOT goes to the status of factory shipment.)
Install OS (Standard monitor OS, communication driver, etc.) or download project data as required.
For how to install each OS or download project data, refer to the following manual.
GT Designer2 Version
(8. TRANSFERRING DATA)
Basic Operation/Data Transfer Manual
14.5.1 Installing the CoreOS
14
14.5 CoreOS
- 13
9
10
11
12
13
14
15
16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt1685m-stbaGt1685m-stbdGt1695m-xtba

Table of Contents