Mitsubishi Electric GT1695M-XTBD User Manual page 240

Got1000 gt16 series graphic operation terminal
Hide thumbs Also See for GT1695M-XTBD:
Table of Contents

Advertisement

(Example:
Dialog box after touching the
Remark
(2) Precautions for operation
(a) Copying project data
If the Boot source drive and copy destination drive for project data is the same, the project data
cannot be copied.
If the drives are the same, cancel the setup.
(b) When project data are copied to the GOT
If OS or project data is copied to the GOT using the CF card or USB memory created with GOT
data package acquisition, the utility setting is also copied.
Check each utility setting after copying to the GOT and change the setting according to need.
(c) CF card or USB memory to be used
When performing GOT data package acquisition, do not store other data to the CF card or
USB memory.
If doing so, the previous data will be unavailable.
11
11.3 Memory/Data Control
- 17
11.3.3 GOT data package acquisition
button)
Copy
Processing time reference
The time required for the processing depends on conditions such as OS, data
capacity, and file structure.
(Reference values)
• When the capacity is 4 Mbytes: Around 6 seconds
• When the capacity is 12 Mbytes: Around 18 seconds
2
The display depends on the status of copy
destination and setup.
Operate with following the displayed
dialog box.
3
After copying OS and data, the dialog box
for notifying the completion appears.
Touching the
button closes the
OK
dialog box.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt1685m-stbaGt1685m-stbdGt1695m-xtba

Table of Contents