Mitsubishi Electric GT1695M-XTBD User Manual page 393

Got1000 gt16 series graphic operation terminal
Hide thumbs Also See for GT1695M-XTBD:
Table of Contents

Advertisement

(5) Data check operation
Carrys out data check of the selected project file.
Dialog at data check normal
Dialog at data check abnormal
1
Touch the
Data check
selecting the file for data check.
The data check is executed and the result
is displayed by the dialog box shown left.
2
If touch
button, the dialog box is
OK
closed.
13.3 OS/Project Information
13.3.2 Project information
9
button after
10
11
12
13
14
15
16
13
- 114

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt1685m-stbaGt1685m-stbdGt1695m-xtba

Table of Contents