Mitsubishi Electric GT1695M-XTBD User Manual page 410

Got1000 gt16 series graphic operation terminal
Hide thumbs Also See for GT1695M-XTBD:
Table of Contents

Advertisement

2
Installing the CoreOS
1
Write the CoreOS from GT Designer2 to the CF card.
For details of GT Designer2 operation, refer to the following manual.
2
After confirming that the GOT is powered off, install the CF card in the GOT.
After installing, switch the CF card access switch on.
3
Powering the GOT on displays the following screen.
To cancel the installation, power the GOT off and remove the CF card.
14
14.5 CoreOS
- 12
14.5.1 Installing the CoreOS
GT Designer2 Version
(8. TRANSFERRING DATA)
Basic Operation/Data Transfer Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt1685m-stbaGt1685m-stbdGt1695m-xtba

Table of Contents