(2) Installing on control panel
The following shows how to install the CF card extension unit on the control panel.
1
Insert the control panel side installation unit into the installation hole of the control panel.
For the installation hole, refer to the following.
5. INSTALLATION
2
Fix the GOT side installation unit by tightening its fixing screws (2 places) with a tightening torque
of 0.36 to 0.48N·m.
3
Insert the connector with the ground cable into the GOT side installation unit, and insert the
connector without the ground cable into the control panel side installation unit.
After inserting the connectors, tighten the connection cable fixing screws.
GOT side installation unit
GOT
4
Connect the ground cable of the connection cable to the FG terminal of the GOT's power.
For connecting the ground cables, refer to the following.
6.6 Grounding Extension Units
Control panel side
installation unit
A
A side
Ground
cable
B
B side
7.2 Option Unit
7.2.2 Installing procedure
1
2
3
4
5
6
7
8
7
- 30