No.
Information
127
79 ON/OFF
2701
>79 ON
2702
>79 OFF
2703
>BLOCK 79
2711
>79 Start
2715
>Start 79 Gnd
2716
>Start 79 Ph
2722
>ZSC ON
2723
>ZSC OFF
2730
>CB Ready
2731
>Sync.release
2753
79 DT delay ex.
2754
>79 DT St.Delay
2781
79 OFF
2782
79 ON
2784
79 is NOT ready
2785
79 DynBlock
2788
79 T-CBreadyExp
2801
79 in progress
2808
79 BLK: CB open
2809
79 T-Start Exp
2810
79 TdeadMax Exp
2823
79 no starter
2824
79 no cycle
2827
79 BLK by trip
2828
79 BLK:3ph p.u.
2829
79 Tact expired
2830
79 Max. No. Cyc
2844
79 1stCyc. run.
2845
79 2ndCyc. run.
2846
79 3rdCyc. run.
2847
79 4thCyc. run.
2851
79 Close
2862
79 Successful
2863
79 Lockout
2865
79 Sync.Request
2878
79 L-N Sequence
2879
79 L-L Sequence
2883
ZSC active
2884
ZSC ON
2885
ZSC OFF
2889
79 1.CycZoneRel
2890
79 2.CycZoneRel
2891
79 3.CycZoneRel
SIPROTEC 4, 7SJ62/63/64 Handbuch
C53000-G1140-C147-A, Edition 07.2015
Type of In-
formation
IntSP
79 ON/OFF (via system port)
SP
>79 ON
SP
>79 OFF
SP
>BLOCK 79
SP
>79 External start of internal A/R
SP
>Start 79 Ground program
SP
>Start 79 Phase program
SP
>Switch zone sequence coordination ON
SP
>Switch zone sequence coordination OFF
SP
>Circuit breaker READY for reclosing
SP
>79: Sync. release from ext. sync.-check
OUT
79: Max. Dead Time Start Delay expired
SP
>79: Dead Time Start Delay
OUT
79 Auto recloser is switched OFF
IntSP
79 Auto recloser is switched ON
OUT
79 Auto recloser is NOT ready
OUT
79 - Auto-reclose is dynamically BLOCKED
OUT
79: CB ready monitoring window expired
OUT
79 - in progress
OUT
79: CB open with no trip
OUT
79: Start-signal monitoring time expired
OUT
79: Maximum dead time expired
OUT
79: no starter configured
OUT
79: no cycle configured
OUT
79: blocking due to trip
OUT
79: blocking due to 3-phase pickup
OUT
79: action time expired before trip
OUT
79: max. no. of cycles exceeded
OUT
79 1st cycle running
OUT
79 2nd cycle running
OUT
79 3rd cycle running
OUT
79 4th or higher cycle running
OUT
79 - Close command
OUT
79 - cycle successful
OUT
79 - Lockout
OUT
79: Synchro-check request
OUT
79-A/R single phase reclosing sequence
OUT
79-A/R multi-phase reclosing sequence
OUT
Zone Sequencing is active
OUT
Zone sequence coordination switched ON
OUT
Zone sequence coordination switched OFF
OUT
79 1st cycle zone extension release
OUT
79 2nd cycle zone extension release
OUT
79 3rd cycle zone extension release
2.14 Automatic Reclosing System 79
Comments
252

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Siprotec sj63Siprotec sj64

Table of Contents