Provisioning; Figure 400: Switch Provisioning; Table 367: Switch Provisioning - D-Link DWL-8600AP User Manual

Dws-4000 series access points
Hide thumbs Also See for DWL-8600AP:
Table of Contents

Advertisement

D-Link UWS User Manual

Provisioning

Use the Switch Provisioning page to request provisioning information from a switch in the cluster. After the
new switch receives the provisioning information, it can join the cluster.
The following table shows the fields available on the Switch Provisioning page.
Field
Switch IP Address
Switch Provisioning Status
Command Buttons
The page includes the following buttons:
• Start—Initiates the provisioning request for the switch.
• Refresh—Updates the page with the latest information.
D-Link
Oct. 2015

Figure 400: Switch Provisioning

Table 367: Switch Provisioning

Description
Enter the IP address of the switch in a cluster to which a new switch
establishes a connection to obtain provisioning information. The
provisioning information enables the new switch to join the cluster.
Shows the status of the provisioning, which is one of the following:
• Not Started
• Success—The provisioning sequence completed successfully.
• Connection Failed—Can't establish TLS connection with the cluster
switch.
• Provisioning Failed—The switch in the cluster did not respond with
expected messages. This can happen if the switch is running code
that does not support switch provisioning or the switch
provisioning mode is disabled on the switch in the cluster.
Configuring Advanced Settings
Unified Wired and Wireless Access System
Page 640

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents