PV start
Specifies either of the following current SP at the start of program operation:
• PV : Process value at start of program operation (PV start)
• SP : SP of step 0 (normal program operation)
Function
When PV" is selected, program operation is started from the position where the cur
rent SP first matches the PV at the start of program operation. If the SP does not match
the PV , program operation is started from the beginning of the program.
"
Setting
F Related description
4.6 Setting Running Conditions/Starting the program run/PV start (page 4 20)
See
Alarm during ramp step enable
• To enable alarms during the ramp step, set to [ON]. To disable alarm, set to [OFF].
Function
"
" : / "
Setting
Run all enable
• To successively execute the program of all patterns from pattern 0, set to [ON].
• Patterns whose pattern execution count" parameter (level 1 mode) is set to 0" are
skipped.
Function
"
" : / "
Setting Range
" : PV/ "
" :SP
Setting Range
"
Setting Range
"
Expansion Mode
Conditions of Use
The set time must be set.
Default
Default
Conditions of Use
The "number of patterns" parameter must
be set to a value greater than "1".
Default
5–41