4. Remove two screws.
5. Release four hooks and then remove
the connector from the operation panel
PWB.
6. Remove the operation panel assembly
upward.
7. Remove ten screws.
8. Release six hooks and then remove the
operation panel PWB.
9. Check or replace the operation panel
PWB and refit all the removed parts.
*: Be careful not to lose a spring.
Connector
Operation
panel PWB
Hook
Screws
Operation
panel PWB
2-2-32
2NC/2NF/2NG/2NN/3P7/3P8/3P9
Screw
Operation panel
assembly
Figure 2-2-36
Screws
Spring
Hooks
Figure 2-2-37
Screw
Screws