DAEWOO M-150 BL2
Installation Procedure
1. Install in the reverse order of removal.
2. Install the battery rod and cable nuts.
D12E513A
DISTRIBUTOR
Removal Procedure
1. Disconnect the negative battery cable.
2. Remove the air filter, resonator with snorkel assem-
3. Disconnect the ignition wires and electrical connec-
D12E514A
4. Remove the distributor.
Important: Mark on the distributor housing and case
before remove distributor (a).
D102E515
Installation Procedure
1. Install in the reverse order of removal.
2. Install the distributor bolts.
10–16 NSm
D12E516A
ENGINE ELECTRICAL 1E – 17
Tighten
D Tighten the battery rod nut to 6–8 NSm (53–71 lb-
in) (a).
D Tighten the battery cable nut to 9-12 NSm (80–106
lb-in) (b).
bly. Refer to Section 1B, SOHC Engine Mechanical.
tor.
D Disconnect the optical sensor connector (1).
D Disconnect the ignition wires (2).
D Remove the ignition wire clip (3).
D Remove the distributor bolts (1).
D Carefully remove the distributor assembly (2).
Tighten
Tighten the distributor bolts to 10–16 NSm (89–142 lb-
in).