Verify the customer's complaint.
1
Are the customer's concerns verified?
2
Is excessive effort required to move a control?
Does a door move too easily on a high-blower
3
setting?
1. Replace the Bowden cable with a longer cable.
2. Add a loop to the cable routing to increase the
effort required to move a control.
4
3. Check for instrument panel interference with the
new cable routing.
Does the control operate properly?
Check the cables for improper routing, kinks, wiring
interference, or other instrument panel interference.
5
Is any cable problem found?
Repair as needed.
6
Is the repair complete?
1. Remove the cable from any door that binds on
the cable.
2. Cycle the door manually.
7
3. Check for door binding.
Is there any door binding?
Check the door seal for proper installation.
8
Is the door seal OK?
1. Check a binding door for shaft alignment, a bent
shaft or a bent door, or a warped case.
9
2. Repair, as needed.
Is the repair complete?
Repair the door seal, as needed.
10
Is the repair complete?
Check for control binding.
11
Does the control bind?
1. Reinstall the cable to the door.
2. Check the cable-to-dash components clearances.
12
3. Repair any interference.
Is the repair complete?
1. Remove the cable from the control.
13
2. Check the control for binding.
Does the control bind?
Replace the control.
14
Is the repair complete?
Replace the cable.
15
Is the repair complete?
DAEWOO M-150 BL2

CONTROLS

Action
HEATING AND VENTILATION SYSTEM 7A – 15
Value(s)
Yes
No
Go to Step 2
System OK
Go to Step 5
Go to Step 3
Go to Step 4
System OK
System OK
Go to Step 5
Go to Step 6
Go to Step 7
System OK
Go to Step 8
Go to Step 11
Go to Step 9
Go to Step 10
System OK
System OK
Go to Step 13
Go to Step 12
System OK
Go to Step 14
Go to Step 15
System OK
System OK