Suzuki sq-416-420-625 Service Manual page 123

Table of Contents

Advertisement

1B-52 AIR CONDITIONING (OPTIONAL)
G16 engine
J20 engine
FOR CAMI PRODUCTION VEHICLE
1) Pour new compressor oil. The amount must be the same with
2) For G16 engine:
3) Connect suction and discharge hoses to compressor assembly.
4) For G16 engine:
5) Connect thermal protector lead wire.
6) Evacuate and charge system according to previously described
3. Compressor pulley
4. Crankshaft pulley
the amount measured in REMOVAL.
NOTE:
Compressor assembly supplied from factory is filled up
with the following amount of oil.
Amount of oil in compressor: 120 cm
Install compressor assembly temporarily to bracket, then install
compressor drive belt (2).
For J20 engine:
Install compressor assembly to its bracket.
Tighten bolts (a).
Tightening Torque
.
(a): 23 N
m (2.3 kg-m, 17.0 lb-ft)
Tension compressor drive belt (2) by tightening compressor as-
sembly mounting bolts. Refer to Section 3B1 for drive belt ten-
sion.
Tighten bolt (a) first, then (b).
Tightening Torque
.
(a): 23 N
m (2.3 kg-m, 17.0 lb-ft)
For J20 engine:
Install generator belt (1). Refer to Section 6H for details.
procedure.
CAUTION:
Be sure to use HFC-134a (R-134a) compressor oil.
3
3
(120 cc, 7.5 in
)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents