Contact Breaker Points Removal; Contact Breaker Points Installation; Condenser Removal - Suzuki GS850G Service Manual

Table of Contents

Advertisement

ENGINE
INSTALLATION
Installation is carried out in the reverse
order
of removal.
*
Apply
THREAD LOCK SUPER "13338"
(99000-3 2020) to Allen bolt.
Thick copper washer
i s
mounted with its
notch directed towards crankshaft.
*
Clean the tapered portion of the rotor and
also tlie crankshaft. Use cleaning
soIvent to
wipe off oil
or
grease so t h a t the surfaces
hecome
completely dry.
*
After mounting the rotor, secure it by
tightening the center bolt to the specified
torq u c
valuc
with applying thread
lock
super
"
1303".
99000-32030
CONTACT BREAKER POINTS
REMOVAL
Remove points cover and gasket.
Remove the mounting
screws and points.
Thread Iock sllper " 1 303"
Uol
t
tightening
torque:
Fig.
7- I23
9.0- 10.0 kg-rn
IG5.0-72.5 Ib-ftl
Loosen lead wire mounting n u t and remove
condenser
and ignition
coil lead wires from
the
points.
Fig. 7-
124
j >
Y\\Y
Installation is carried out in the reverse
\
h
order
of
removal.
6.- \A
,,
1S
2 L x V
'
-.-
*
The condenser and ignition coil lead wires
-.
i 7 -
t
*
/
; I
; ,
are mounted on the outer side of insulated
. .
washer.
CONDENSER
REMOVAL
*
Remove point cover and gasket.
*
Remove condenser mounting screws and
Fi,c.
7-
I22
then condenser from contact breaker.
Replace gasket by new one
to
prevent oil
leakage.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents