Steering Stem Nut Tightening Method - Suzuki GS850G Service Manual

Table of Contents

Advertisement

Insert
the: steering
stem into the head
pipe
from
below. Place the
upper
bearing
on
the
upper portion of the
head pipe.
place the
upper dusr
seal
on he
bearing
and tighten
the srecring nut.
Tighten
the nut
using
the
special
rorque
wrench
9.
Steering
stem nzlt
tightening method
Steering nut
socket wrench
NOTE:
Tighten
the steering sretn
lock
nut
ro
a
ssr fficiea
r
de~ree for assemblin~. It
can
be changed
durinl:
sli
bsequen
r
read-
jusrmenr of /he s r e e r i n ~ .
09940- 149 10
CAUTION:
The following
adjustment procedure applies
when the
front fork
has already been
set.
Follow the steps below for adjusting and
checking the steering stem.
1 . Using
the steerin3
nut,
socket
and a torque
wrench,
tightcn ~ h c szem
nut
to 4.0-5.0
kg-rn (29.0-36.0
lb-ft,)
2.
Move the
stecring stem back and forth five
or
six
times
to sea! the bearings.
3. Turn the
steering
stem nu!
back
to
0 kg-rn.
Then
retighten
very lightly so that no play
can be detected in the stem.
4.
Install ;the steering stem
head
and tem-
porarily
tighten the steering stern head
center bolt to 2,O-3.0
kg-rn
(14.5-21.5
Ib-it).
5. Tighten the steering stem side bolt to
1.5-
2.5 kg-m (1
1.0-18.0
Ib-ft).
6. Turn the stem nut back slightly and tightell
the
steering
stem head center
bolt to it's
normal torque
of
33.6-5.2 kg (26.0-37.5
lb-ft).
When the front fork
is
moved
hack
and forth. it must move freely. If there is
any
play
in
the forks. loosen the center bolt,
tighten the stem nut slightly and retotqrie
the center bolt.
Install the handle bar using the
two
clamps
and
four bolts.
Steering stem head
center
bolt:
Steering stem
side
bolt:
3.6-5.2 kg-m
(26.0-37.5 Ib-ft)
1 .S-2.5 kg-m
t i 1.0-1
8,O
lb-ft)
Push the main
wire
harness
O
forward
through
the left lower portion of the
steering stem.
A
bolt fastens the oil hose
joint
on
the
lower portion of the steering
stem. The holder is fastened
by
this bolt
together with other parts. Firmly secure the
wire
harness
with
this holder
after
assembling the hose
joint.
Tightening
torque:
Route
clutch
cable
GI
and
lead
wires@
,t9 of
left and
right handle bar
switches
to
the front
side
of
the steering
stem head
as
shown in the drawing.
1.2-2.0
kg-rn
(8.5- 1
4.5
Ib-ft)
Fig.
J
J -42

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents