Cub Cadet 6X4 Shop Handbook page 209

Table of Contents

Advertisement

19.
Attach a lifting apparatus, and carefully raise the
engine. Support the engine without straining
any of the electrical connections.
See Figure 7.32.
Engine is
lifted and
supported for
final disconnection
of wires
Figure 7.32
NOTE: Be careful of the engine oil drain valve.
It hangs-down slightly beneath the bottom of the
crankcase.
20.
Disconnect the remaining wires between the
engine and the vehicle. See Figure 7.33.
Vehicle harness
Figure 7.33
Unplug the engine harness from the main wiring
harness.
Disconnect the heavy gauge black ground cable
and its attached light gauge green ground wire
from their attachment point on the upper starter
bolt using a 10mm wrench.
Chapter 7 - Kohler Engine Service Access and Fuel System
Engine
harness
205
21.
Remove the engine completely, placing it on a
strong workbench or stable work platform.
22.
Prior to engine installation, check all the service
points on the engine that are easily assessable
while it is removed.
23.
Prior to engine installation, check all of the ser-
vice points on the chassis that are easily
reached while the engine is removed.
See Figure 7.34.
Engine
mounting spacers
Figure 7.34
Check the rubber isolator mounts that connect
the drive system cradle to the frame. Replace
any that are suspect.
The metal spacers that the engine rests on can
be held in place during engine installation with
silicone RTV sealant or automotive trim adhe-
sive.
Engine tray
isolator mounts

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Poly bed 4x2Steel-bed 4x24x4

Table of Contents