Figure 7-16 Active/cold addition flow (building block configuration only)
1. Open rack door
2. Check operating condition of system and
I/O device usage status
3. Check assignment status of PCIe card
4. Release chassis requiring maintenance from
partition
5. Release chassis requiring maintenance from
system
6. Enable access to FRU requiring maintenance
7. Mount installation part
8. Restore chassis requiring maintenance
9. Incorporate chassis requiring maintenance
into system
10. Diagnose chassis requiring maintenance
11. Incorporate chassis requiring maintenance
into partition
12. Confirm that there is no problem with the
replaced FRU
13. Restore logical domain
14. Close rack door
Installation complete
Chapter 7 Maintenance Flow
141