Fujitsu M10-4 Service Manual page 153

Hide thumbs Also See for Fujitsu M10-4:
Table of Contents

Advertisement

Figure 7-14     Active/hot addition flow (for a PCIe card)
1. Open rack door
2. Check operating condition of system and
I/O device usage status
3. Lower cable support
4. Install PCIe card
5. Fix cable support
6. Incorporate PCIe card
7. Confirm that there is no problem with
installed FRU
8. Close rack door
Table 7-15     Active/hot addition work procedure (for a PCIe card)
ItemWork procedure
1 Opening the rack door
2 Checking the operating condition of
the system and the I/O device usage
status
3 Lowering the cable support
4 Installing a PCIe card
5 Fixing the cable support
6 Incorporating the PCIe card
7 Confirming that there is no problem
with the installed FRU
8 Closing the rack door
Installation complete
Reference
"5.3 Checking the Operating Condition and Resource Usage
"5.9.2 Lowering the cable
"Chapter 8 Maintaining the PCI Express
"6.1.2 Fixing the cable
"6.5.2 Incorporating an I/O
Express
card"
"4.2.2 Identifying a
support"
Cards"
support"
device" -
"Incorporation of a PCI
failure" -
"Checking the FRU
Chapter 7 Maintenance Flow
Status"
status"
139

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fujitsu m10-4s

Table of Contents