Monitoring The Initialization Processes; Figure 29: Switch Initialization Messages - Allied Telesis AT-x230-10GP Installation Manual

Gigabit ethernet switches
Hide thumbs Also See for AT-x230-10GP:
Table of Contents

Advertisement

Monitoring the initialization processes

Verifying release... OK
Booting...
Starting base/first...
Mounting virtual filesystems...
______________
/\ \
/
\ \_
/
\ |
/
\ \
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v0.0.0
Current release filename:x230-5.4.4.rel
Original release filename: x230-5.4.4.rel
Built: Mon Mar 31 12:15:15 NZDT 2014
Mounting static filesystems...
Checking flash filesystem...
Mounting flash filesystem...
Checking for last gasp debug output...
Checking NVS filesystem...
Formatting NVS...
Mounting NVS filesystem (second attempt)...
Starting base/dbus...
Starting base/syslog...
Starting base/loopback...
Starting base/poe_done...
Starting base/sysctl...
AT-x230-10GP, AT-x230-18GP and AT-x230-28GP Switches Installation Guide
It takes about thirty seconds for the switch to initialize its management
software programs and features, and load the default configuration.
You may also monitor the bootup sequence by connecting a terminal or
computer that has a terminal emulator program, to the console port on the
master switch. You will see the messages from Figure 29 below to Figure
31 on page 63.
F
29. S
IGURE
WITCH INITIALIZATION MESSAGES
____
/ /______\
__/ /| ______ |
|
/
| ______ |
/ /
\ ____ /
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
61

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x230-18gpAt-x230-28gp

Table of Contents