Unpacking The Switch: At-X230-18Gp - Allied Telesis AT-x230-10GP Installation Manual

Gigabit ethernet switches
Hide thumbs Also See for AT-x230-10GP:
Table of Contents

Advertisement

Unpacking the switch: AT-x230-18GP

AT-x230-10GP, AT-x230-18GP and AT-x230-28GP Switches Installation Guide
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipped package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipped package includes the following items:
AT-x230-18GP
1 Power cable hook
1 Power cable (1.8m)
1 Console cable (2m)
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x230-18gpAt-x230-28gp

Table of Contents