▼ Verify Correct Operation of the Slide
Rails and the CMA
Perform this procedure both before and after you install the server cables in the
CMA. Performing the procedure before the CMA contains cables helps ensure that it
extends and contracts smoothly before the cables are added.
Note – The CMA includes velcro straps to secure the cables inside the CMA. Do not
install the velcro straps until you have installed the CMA, connected the cables, and
placed the cabling inside the CMA.
Tip – Two people are needed for this procedure, one to move the server in and out
of the rack, and one to observe the cables and CMA.
1. For a free-standing rack, deploy the antitilt bar.
2. Unlock the slide lock buttons at the right and left sides of the chassis.
36
SPARC T4-1 Server Installation Guide • August 2013

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T4-1 and is the answer not in the manual?

Table of Contents