ENCODE to DATA Delay (Hold Time) is the absolute minimum propagation delay through the analog-to-digital converter.
4
ENCODE to DATA Delay (Setup Time) is calculated relative to 65 MSPS (50% duty cycle). In order to calculate t
Newt
= t
– t
+ t
(i.e., for 40 MSPS: Newt
S_E
ENC(NEW)
ENC
S_E
5
DRY is an inverted and delayed version of the encode clock. Any change in the duty cycle of the clock will correspondingly change the duty cycle of DRY.
6
Data Ready to DATA Delay(t
H_DR
and t
for a given encode use the following equations:
S_DR
Newt
= t
/2 – t
+ t
H_DR
ENC(NEW)
ENCH
Newt
= t
/2 – t
+ t
S_DR
ENC(NEW)
ENCH
Specifications subject to change without notice.
t
A
N
AIN
ENC, ENC
N
t
E_FL
t
E_RL
D[13:0], OVR
DRY
Name
2
t
H_DR
2
t
S_DR
t
A
t
J
and t
.
ENC
ENCH
and t
use the following equation:
H_DR
S_DR
)) × t
/2
ENC
)) × t
/2.
ENC
= 25 × 10
S_E(TYP)
and t
) is calculated relative to 65 MSPS (50% duty cycle) and is dependent on t