Front Hub Installation (Atv150/200/260/300); Chapter 5 Final Drive - Linhai 2004 ATV 260 Service Manual

Linhai atv 2004-2005, 2009
Table of Contents

Advertisement

CHAPTER 5 FINAL DRIVE

ATV SERVICE MANUAL 09.0
5.4 .a .FRONT HUB INSTALLATION (ATV150/200/260/300)
1. Inspect spindle seal on strut and bearing
surface for wear or damage.
2. Apple grease to spindle and bearing.
3. Install spindle into strut.
4. Install bearing to spindle.
5. Install spacer on spindle (2WD).
6. Install bearing 30205 on spindle (2WD) .
7. Apply grease.
CHAPTER 5
FINAL DRIVE. 5-
6

Advertisement

Table of Contents
loading

Table of Contents